BIM 4D Modeling Improve The Cost, Planning and Coordination of The Construction Project



A new perspective in the AEC industry

1910! A 99-year strong at present, Henry Gantt, an American mechanical engineer designed a graphical popularly called Gantt chart, named after him, track project progress in relation to the time constraint. It was a popular technique for project planning. 4D model is a 3D CAD model connected to the fourth dimension of time through planning. The continuous advancement in technology and the emergence of Building Information Modeling (BIM) have removed all the challenges associated with the 4D programming. With the growing success of BIM models kingdom, the adoption of the 4D modeling becomes the norm today.

Rich in information, BIM modeling services give architects a multitude of tasks and builders of a number of significant advantages centered design, including greater coordination, constructability analysis, BOQ, quantification and cost and so on. One of the most important developments in building applications for BIM is the project planning, the design and construction meet. At the heart of a project planning is the construction project, the backbone of a project planning. 4D scheduling plays an important role in planning the project.

4D model provides many details on the project team. With 4D construction simulation process, architects can evaluate various options and choose the best alternative in the project design phase.

4D modeling provides significant benefits of 3D modeling
4D model is an evolution of the 3D model. It challenges and changes many conventional programming practices. Some important considerations are:

Design view: 4D model allows the programmer to see the site of the entire building in a word. It helps programmer to detect inconsistencies and avoid visual incongruities in the representation.

Better integration and cost estimate: Integration of human resources, materials, equipment and resources with the BIM model, 4D programming to better schedule and the estimated cost of the project. 4D BIM also monitors the status of the project to supply materials.

Detection and resolution: During the design and construction phase, potential spatial conflicts may arise between building elements.

Improved time management: Integrated with BIM modeling, 4D scheduling helps the owner and the project team to easily view the time constraints and opportunities for improvement and investment in the project.

Maximizing critical resources: 4D model allows the project team to evaluate various alternative resources and working fields over a period of time to optimize resources and manpower accordingly.

4D BIM Project Planning with
Adding the calendar date for the components of the model, the project team improves the plan and integrates communication between the various divisions. Over time, the project team unites programming agenda for BIM model to evaluate different construction options to make optimal choices.
 
There are methods for connecting a BIM project planning

Direct link between Revit and MS Project